Skip to content
Six Design Group logo
Remodeled bathroom in a Dallas ranch home with a glass walk-in shower, white oak vanity and porcelain floor tile

Six Design Group · Dallas, TX

Bathroom Remodeling in Dallas, TX

Bathroom remodeling in Dallas, TX means fixing what older homes hide behind the tile, from worn shower pans to drains on shifting clay slabs. Six Design Group designs and builds showers, tubs, vanities, tile and full layouts from our Lake Highlands base, and we tell you up front what will change and how long the room is out.
  • 34 Google reviews
  • Design and build under one team
  • Based in Lake Highlands, Dallas
  • Mon–Fri 9 am–5 pm

According to Point2Homes, half of Dallas homes were built before about 1981, so a typical house here is more than 40 years old, and in its bathroom the finishes are rarely the only problem. Behind the tile there is often a tired shower pan, galvanized or cast-iron drain lines, or a subfloor softened by years of small leaks. A good bathroom remodel fixes what you can see and what you cannot.

What a Full Bathroom Remodel in Dallas Includes

A full bathroom remodel takes the room down to the studs and the slab or subfloor and rebuilds it. On a typical job our scope covers:

  • Design consultation and layout. Measurements, a floor plan and elevations of the shower, vanity wall and any niches.
  • Material selection. Tile, stone tops, plumbing fixtures, vanity, lighting and glass, chosen with you and ordered before demolition.
  • Demolition and inspection of what is underneath. Old tile, mortar beds, drywall and fixtures come out; we check framing, subfloor and drains.
  • Plumbing and electrical rough-in. New valves, drains and supply lines by a licensed plumber; outlets, lighting circuits and a properly vented exhaust fan by a licensed electrician.
  • Waterproofing and tile. Shower pan, waterproof membrane, flood test, then wall and floor tile with sealant at every change of plane.
  • Finish installation. Vanity, countertop, toilet, glass, mirrors, accessories and paint.
Dallas bathroom stripped to the studs during a full bathroom remodel
Taking a bathroom to the studs exposes the drains, framing and subfloor that need repair before new tile goes on.

Which Bathroom Project Fits Your Home?

Not every bathroom needs the full treatment. Pick the page that matches your room for the details and cost drivers of that job:

Talk Through Your Bathroom Remodeling Project

Tell us what is not working in the room today. We will walk through options, the order of work and what drives the price, then follow up with a written scope.

  • 34 Google reviews
  • Design and build under one team
  • Based in Lake Highlands, Dallas
  • Mon–Fri 9 am–5 pm

How Our Bath Remodel Process Runs, Step by Step

Every bathroom renovation we build runs in this order.

  1. Consultation. We visit, measure, look at the plumbing and ask how the room gets used day to day.
  2. Design and selections. You get a layout and a materials list. Fixtures and tile are ordered so they are on hand before demolition.
  3. Permits. When plumbing, electrical or framing changes, we apply for the permit with the city before work starts.
  4. Protection and demolition. We seal the work area, protect the path from the door and remove the old finishes down to sound material.
  5. Rough-in and inspection. Plumbing and electrical go in and are inspected while the walls are still open.
  6. Waterproofing, finishes and walkthrough. The shower is waterproofed, flood tested, tiled and fitted out, then we walk the room with you, test every fixture and close the punch list.

Kenton G. put it well in his Google review: he had "a clear understanding of what to expect and when to expect it."

Porcelain tile and quartz samples laid out for a bath remodel in Dallas
Choosing tile, stone and fixtures before demolition keeps the schedule from stalling halfway through.

What Drives the Cost of a Bathroom Renovation in Dallas?

The layout is the biggest lever. Leaving the toilet, shower drain and vanity where they are keeps plumbing simple. Moving a drain on a slab foundation means saw-cutting and trenching the concrete, new pipe and a plumbing inspection before the slab is patched. Pier-and-beam homes let the plumber work from the crawlspace, which is usually easier.

After the layout, cost follows the square footage of tile, the tile itself (large-format porcelain and natural stone take more labor than standard ceramic), custom frameless glass, the vanity and top, and what demolition uncovers. A permit adds review time and inspection stops, and choosing fixtures late can force a second trip for the plumber. Jeff H. had both bathrooms done and called the team "very fair when unexpected issues came up." Our bathroom remodel cost guide for Dallas walks through these drivers in more depth.

What a Bathroom Remodeler Finds Behind Dallas Tile

The signs that a bathroom needs more than new finishes are usually small: grout that keeps cracking, a soft spot by the toilet, a musty smell under the vanity. Dallas housing explains most of them:

  • Mud-set tile. Many 1950s and 1960s bathrooms have tile set in a thick mortar bed over metal lath. It is durable but heavy, and removing it takes more time than modern tile.
  • Shifting slabs. The expansive Blackland Prairie clay under much of Dallas swells and shrinks with moisture, which cracks rigid tile installed without movement joints.
  • Post-tensioned slabs. Many newer North Texas homes sit on post-tensioned slabs. Cutting into one for a drain or a curbless shower requires locating the steel tendons first.
  • Lead paint. If the house predates 1978, the EPA's Renovation, Repair and Painting rule governs how painted surfaces can be disturbed.
  • Hard water. Dallas water leaves white mineral spots on glass and chrome, which shapes how we pick glass coatings and fixture finishes.
Old mortar-bed tile shower wall being removed in a mid-century Dallas bathroom
Mid-century showers often have tile set in a thick mortar bed, which takes longer to remove than modern tile.

Permits, Licensed Trades and Choosing a Bathroom Remodel Contractor

Texas has no state license for remodeling contractors, but the trades inside a bathroom are regulated. Plumbing must be done by plumbers licensed by the Texas State Board of Plumbing Examiners (TSBPE), and electrical work by electricians licensed by the Texas Department of Licensing and Regulation (TDLR). Dallas also requires any contractor who pulls a permit to be registered with the city.

Whoever you hire, ask for their city registration, plus license numbers for whoever will handle the plumbing and electrical, then check them on the TSBPE and TDLR license lookups. A bathroom remodel company that skips permits leaves you with uninspected plumbing behind your new tile.

Bathroom Renovation Across Dallas and Nearby Cities

We remodel bathrooms across Dallas, from Lake Highlands to Oak Cliff, and in neighboring cities including Richardson, Garland and Plano. Richardson and Garland are about 20 minutes from our base, and Plano is about 30. Every city has its own permit and inspection office, and we work with whichever one covers your address.

Finished bathroom remodel in a Dallas home with double vanity and walk-in shower
A finished bathroom with a double vanity, walk-in shower and slip-resistant floor tile.

Why Six Design Group for Bathroom Remodeling

  • Design and construction from one team

    The people who draw your layout and help pick the tile are the same people who build it, so nothing gets lost between a designer's plan and a contractor's crew.

  • Arian and Ax lead the work

    Reviewers mention Arian and Ax, who lead our projects, by name. You deal with the people responsible for the job, not a rotating cast.

  • Clear expectations before demolition

    Homeowners describe knowing what was happening and when. We walk you through each phase, the decisions due and the days the bathroom will be out of service.

  • Fair handling of hidden problems

    Old bathrooms hide rot, bad drains and failed pans. When something turns up, we show it to you, explain the fix and price it before going further.

Bathroom Remodeling Services We Offer

What Customers Say About Working With Us

Real words from Six Design Group customers on Google, quoted as written. Six Design Group has 34 Google reviews (checked November 2026).

“Arian and Six Design Group were great to work with. Our bathroom remodel turned out to be an easy transition for the family with limited down time and a clear understanding of what to expect and when to expect it. The issues they found were always followed up with solutions, and their attention to tiniest of details was exactly what we ere looking for.”
Kenton G. · Google review · 2024
“Ax and Arian sat down with to fully understand what it was that I was trying to achieve. They were communicative throughout the process and most importantly to me kept on budget! Would most definitely recommend them for your remodeling needs!”
Hunter D. · Google review · 2024
“If you’re needing a kitchen remodeled, bathroom remodeled or other construction work ,Six Design Group does excellent work! You won’t find someone who is more dedicated and reliable to work with. I’ve known and sold Arian numerous homes and you won’t find a more hands on nice guy for your project.”
Glen C. · Google review · 2024

Read all reviewsLeave a review on Google

Where We Do Bathroom Remodeling Around Dallas

Bathroom Remodeling Questions, Answered

How much does a bathroom remodel cost in Dallas?

It depends on how much changes. Keeping the toilet, tub and drains where they are costs far less than relocating them, especially on a slab where moving a drain means cutting concrete. Tile area, custom glass, the vanity and whether walls open to the studs add the rest. We price your room after we measure it and you pick finishes, and our bathroom cost guide explains the main drivers.

How long will I be without my bathroom?

For a bathroom that keeps its layout, the room is usually out of service for a few weeks, and one reviewer had his bathroom installed in two weeks. Moving plumbing, waiting on inspections or custom glass, and curing time for the shower pan and grout stretch that. We give you a day-by-day outline before demolition so you can plan around it.

Can I stay in my home during a bathroom remodel?

Yes, most people do, as long as there is a second working bathroom or a plan for one. We seal the work area with plastic sheeting, protect the floors along the path to the bathroom and clean up at the end of each day. If the remodeled bathroom is the only one in the house, we plan the schedule around getting a toilet back in service quickly.

Do you handle plumbing permits for moved fixtures?

Yes, we coordinate the permit and inspections as part of the job. In Texas, plumbing must be done by a plumber licensed by the Texas State Board of Plumbing Examiners, and in the City of Dallas the permit is pulled by a registered contractor. The plumbing is inspected before walls and floors close up, which is why permitted work matters when you sell.

What do I need to choose before demolition starts?

Pick the tile, the shower valve and trim, the tub if there is one, the vanity and top, and the toilet. Those items set rough-in heights and drain locations, so they need to be decided and ideally on site before the old bathroom comes out. Paint, mirrors and accessories can wait until later in the job.

Request an Estimate for Bathroom Remodeling

Calling is fastest: (239) 545-0550. Or send the basics and we will call you back on the next business day.

Prefer to talk? Calling (239) 545-0550 is the fastest way to reach us. We reply to form requests on business days.

Related Services

Ready to Start Your Bathroom Remodeling in Dallas?

Call to set up a consultation. We will look at the space, talk through options and the order of work, and follow up with a written scope you can compare.

  • 34 Google reviews
  • Design and build under one team
  • Based in Lake Highlands, Dallas
  • Mon–Fri 9 am–5 pm

Six Design Group · Lake Highlands, Dallas, TX 75238 · (239) 545-0550 · ax@sixdesigngroup.com · Monday – Friday 9:00 am – 5:00 pm · Saturday – Sunday Closed

Call (239) 545-0550Estimate